Project objectives and activities

Objectivesare consistent with thefinancing strategy of the Sectorial Operational Programme of Environment -Axis 4, on conservationof biodiversity, species of wild faunaandefficient managementofprotected areas.

  1. The elaboration sets ofmanagement measuresat national levelfor speciesCastor fiber, LutralutraandMustelalutreola;
  2. Implementation oftechnical solutionsto reducedamageand implicitlyconflicts;
  3. Informing theinterest groups andstakeholdersinmanagementtraining of the speciesCastor fiberspecies, Lutralutra, Mustelalutreola;

 

Project activities and objectives :


             Objective 1.
The elaboration sets ofmanagement measuresat national levelfor the species Castor fiber, Lutra lutra and Mustela lutreola;

 

A.1.Analysis ofthe conservation status of the speciesCastor fiberat national level
A.2.Analysis ofthe conservation statusof the species Lutra lutra at national level
A.3.Analysis ofthe conservation statusof the species Mustela lutreola at national level
A.4. Interest groups analysis and socio-economic context.

A.5. Determining the types and levels of human-beaver conflicts
A 5.1. Identifying areas of human-beaver interference, potentially generating conflict
A 5.2. Determining the nature and extent of beaver damage.
A.6. Classification and quantification of human-otter conflicts
A.7. Study onthe impact of hydrotechnical constructions on the species Castor fiber and Lutra lutra
A.8. Study on the calculation of compensation required for beaver and otter damage.
A.9. The elaboration sets of management measures at national level for the species Castor fiber, Lutra lutra and Mustela lutreola

 

Objective 2. Improvement beaver and otter conservation in Natura 2000 sites;
D.1. Implementation of technical solutions to maintain the conservation status of beaver and otter in three Natura 2000 sites.

 

Objective 3. Awareness of the interest groups and training stakeholders in the management of the species Castor fiber, Lutra lutra, Mustela lutreola.

E.1. Promoting the objectives and dissemination of project results
F.1. Training the APM personnel and custodians to increase institutional capacity for management of protected areas.

Other activities
Project management activities (MP)

MP.1. Project Management
MP.2. Audit